Feb 24, 2023
Green Technology Worth Knowing About for 2023 (and Beyond)
ADC and an international investor teamed up to conduct a due diligence to acquire a stake in a Heavy Fuel Oil facility in Mombasa, Kenya. The facility had been in operation for 11 years and had a remaining net plant capacity of 75 MW.
The aim of the due diligence was to determine whether the proposed investment would render required returns within the remaining life span of the facility.
The Kelvin power station is situated in Johannesburg and was constructed in 1957, making it one of the oldest coal fired power stations in South Africa. The original capacity of this facility was 600MW but with the shutdown of a portion of the plant in 2012, it currently has a capacity of approximately 300MW.
ADC was approached by an international Company to conduct an evaluation on a 1040 MW Combined Cycle Gas Turbine station (CCGT), in the Middle East. As part of this evaluation process, ADC had to compile a comprehensive Due Diligence report and investment model of the power station’s business, that would comply with the requirements of international financing.
An international cement manufacturer is constructing a plant near Kimpese, in the Bas Congo Province of the Democratic Republic of Congo (DRC). The new substation was constructed to provide power to the cement plant and will be supplied from SNEL’s Kwilu Substation with a 220kV transmission line. The distance is approximately 14 km.