Feb 24, 2023
Green Technology Worth Knowing About for 2023 (and Beyond)
To develop and own, with partners, projects in the global energy sector and to be the preferred supplier of life cycle management services in this industry.
We will add value to our CLIENTS by our commitment to provide quality services that are reflective of our non-compromising approach to health, safety and the environment we operate in.
We are committed to provide quality services in a safe, healthy and environmentally responsible manner. We treat all our employees, clients, contractors, suppliers and public with respect. We conduct our business in an ethical manner and do not tolerate any unethical behaviour by our personnel or individuals or companies we deal with.
Call Us Now
We assist factories, foundries and other clients in the heavy industry to become less dependent on utility power.
We do this by developing dedicated power generating facilities to supply their electricity needs. Projects can be funded off balance sheet, using debt capital or by bringing equity partners on board. Sometimes a mix of these options works best.
In Africa and various other parts of the world generating capacity is under massive strain and large industry players such as foundries and mines are regularly instructed to cut back on usage in order to maintain grid stability. These cut-backs result in massive losses in revenue – eroding job security and stifling economic growth. At ADC Projects we help to alleviate the effect of cut-backs and ensure that the wheels of industry keep turning.
ADC conducted a Technology Due Diligence and selected 10 x GE Jenbacher 24 cylinder engines with a generation capacity of 40MW. ADC developed the project, at risk, over a period of 4 years to reach financial close in 2013.
Read MoreADC conducted a Technology Due Diligence and selected 10 x GE Jenbacher 24 cylinder engines with a generation capacity of 40MW. ADC developed the project, at risk, over a period of 4 years to reach financial close in 2013. Construction of this gas facility commenced in June 2014 with ADC in the role of Owner’s Project Manager. The facility reached Deemed Commercial operation in December 2015. ADC is appointed as the Kuvaninga facility’s Operations and Maintenance contractor for a period of 14 years.
ADC Projects’ engineering team is ready to assist you in various phases of development in renewable energy from determining the natural resource available to providing guidance towards the best suited equipment supplier.
Read MoreADC Projects’ engineering team is ready to assist you in various phases of development in renewable energy. From determining the natural resource available to providing guidance towards the best suited equipment supplier and determining your long term operations partner. ADC has the insight to determine the network requirements to put such an asset onto the grid. ADC has successfully commissioned- and are managing Solar facilities.
In its effort to assist its clients in the development of their projects from their inception to implementation, ADC Projects has at its disposal an engineering team equipped with the necessary tools to conduct an array of network studies.
Read MoreADC Projects is equipped with an engineering team that possesses the necessary tools to conduct a variety of network studies. This enables the company to assist its clients throughout the entire development process of their projects, from inception to implementation.
African Data Corporation (ADC) is established as an electronic commodity trading platform.
The commodity trading idea is later replaced with project management and consulting work.
First consulting work performed under the ADC flag:
Import and distribution of high-end polypropylene stationary and tankless water heating systems from Israel.
ADC acquires and manages a retail store.
ADC acquires and manages a restaurant.
ADC property development and investment commences.
ADC performs pre-construction surveys and management of the public participation process for the 40MW gas-fired power station project.
Start of construction on ADC’s 40MW project named Kuvaninga in Chokwe, Mozambique.
First operations commence at the Kuvaninga 40MW power station, managed by ADC Projects, after awaiting gas supply.
Project development services of a 200MW Solar Farm in Brazil.
Technical Advisory and engineering services for DRC Ministry of Energy & SNEL.
Engineering, procurement and commissioning of a 3MW containerised gas engine for standby power at Kuvaninga, Mozambique.
Project management and site supervisory services for Hidroeléctrica de Cahora Bassa in Mozambique.