Kuvaninga Energia - Operations and Maintenance

ADC was approached by the Mozambican Electricity utility, Electricidade de Mocambique (EdM) to act as the Owner’s Engineer, Project manager and site supervision for the construction and commissioning of the High-Pressure Customer Metering Station (HPCMS) in Chokwe.

The HPCMS receives Royalty gas from the Temane gas pipeline at approximately 110 BarG. The gas pressure is then stepped down in two stages to 6,6 BarG, to meet the Kuvaninga Power station gas requirements.

The notice to proceed was issued on 1 June 2016 with a planned construction schedule of 38 weeks. The plant was successfully commissioned in March 2017, two days ahead of schedule.
Image
Kuvaninga HPCMS – Chokwe
DC was approached by the Mozambican Electricity utility, Electricidade de Mocambique (EdM) to act as the Owner’s Engineer, Project manager and site supervision for the construction and commissioning of the High-Pressure Customer Metering Station (HPCMS) in Chokwe.
Image
Combined Cycle Gas Turbine station
ADC was approached by an international Company to conduct an evaluation on a 1040 MW Combined Cycle Gas Turbine station (CCGT), in the Middle East. As part of this evaluation process, ADC had to compile a comprehensive Due Diligence report...
Image
Coal Fired Management: Kelvin Power
The Kelvin power station is situated in Johannesburg and was constructed in 1957, making it one of the oldest coal fired power stations in South Africa. The original capacity of this facility was 600MW but with the shutdown of a portion of the plant in 2012...

Kalumbila 330kV Technical Feasibility Study

Towards the end of 2019, Enterprise Power DRC (EPDRC) requested ADC to carry out a study of ZESCO and SNEL networks, to determine whether a Kalumbila – Kolwezi 330 kV interconnection was a viable option, compared to a Kansanshi - Likasi 330 kV interconnection. The purpose was to increase the imports from Zambia to alleviate the shortage of energy in the Katanga. Most of the new mining projects were situated in the Kolwezi area but the Kalumbila – Kolwezi line was longer by about 45 km.

The ADC report was issued in March 2021; the Client shared it with ZESCO who then requested a full technical feasibility study of the Kalumbila – Kolwezi interconnection. The line route had to be adjusted to take into account new mining activities near Kalumbia. The technical feasibility study was issued in April 2021 with network studies, drawings, detailed cost estimates and functional specifications of the equipment, including secondary equipment
Image
HFO Fired Due Diligence: Kenya Facility
ADC and an international investor teamed up to conduct a due diligence to acquire a stake in a Heavy Fuel Oil facility in Mombasa, Kenya. The facility had been in operation for 11 years and had a remaining net plant capacity of 75 MW.
Image
Development of Power Alt Facility
Development on the Power Alt facility; Middelburg, South Africa, started in 2007, where ADC was able to reach financial close on this 10MW facility within 3 weeks of partnering with an interested lender/investor.
Image
40MW Natural Gas Project: Kuvaninga Energia
ADC conducted a Technology Due Diligence and selected 10 x GE Jenbacher 24 cylinder engines with a generation capacity of 40MW. ADC developed the project, at risk, over a period of 4 years to reach financial close in 2013.

Kuvaninga Energia - Containerised Engine Unit

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Morbi commodo placerat venenatis. In accumsan eros quis ante fringilla vehicula. Etiam mollis est ac vulputate sollicitudin. Ut consectetur odio interdum ipsum tincidunt malesuada. Suspendisse potenti. Cras finibus nibh nisi, et suscipit turpis rhoncus sit amet. In ligula arcu, aliquet sed placerat dapibus, semper euismod massa. Mauris sagittis lacinia augue non ornare. Integer varius, lectus eget porta dignissim, leo odio sodales mauris, quis tincidunt augue enim eu leo.

Quisque ut sagittis massa, vitae fringilla magna. Curabitur varius ex vitae massa dictum tristique. Nulla in dignissim lectus. Sed convallis scelerisque diam, vitae ultrices enim bibendum vitae. Praesent non placerat urna. Quisque quis lobortis elit, vehicula volutpat tortor. In hac habitasse platea dictumst. Duis volutpat facilisis purus in auctor. Nam consequat sem eu laoreet tempor. Aliquam gravida libero a sodales mattis. Etiam convallis mauris eget justo luctus, quis sollicitudin tellus egestas.
Image
Soitec Solar Facility
ADC was approached by the international technology supplier Soitec to perform SPV management tasks for the Special Purpose Vehicle Company which was formed to construct a 40MW Concentrated Photovoltaic Solar facility.
Image
Crossborder Transmission Project
ADC conducted a Feasibility Study on behalf of a private mine to assess the feasibility of a potential High Voltage cross-border transmission line, supplying electricity to the mines in the DRC directly from Zambia.
Image
EDM network integration
This project entailed the interconnection of the 40MW Kuvaninga Power Facility to the network consisting of a 7 km double circuit 110kV transmission line from the Kuvaninga facility to the Lionde substation in Chokwe.

Vilamoura, Portugal - 24kw Solar PV installation

ADC provided this PV project on an EPC bases to a commercial residential estate.
Image

Boliqueime, Portugal - 15kw Solar PV installation

ADC provided this PV project on an EPC bases to a residential small holdings.