ADC was approached by the Mozambican Electricity utility, Electricidade de Mocambique (EdM) to act as the Owner’s Engineer, Project manager and site supervision for the construction and commissioning of the High-Pressure Customer Metering Station (HPCMS) in Chokwe. The HPCMS receives Royalty gas from the Temane gas pipeline at approximately 110 BarG. The gas pressure is then stepped down in two …
Combined Cycle Gas Turbine station – Due Diligence report
ADC was approached by an international Company to conduct an evaluation on a 1040 MW Combined Cycle Gas Turbine station (CCGT), in the Middle East. As part of this evaluation process, ADC had to compile a comprehensive Due Diligence report and investment model of the power station’s business, that would comply with the requirements of international financing. This due diligence …
40MW Natural Gas Project: Kuvaninga Energia
Kuvaninga Energia – Chokwe; Mozambique ADC was approached by an international developer to assist in a solution to effectively and efficiently utilise 3 million gigajoules of Mozambican Royalty Gas. ADC conducted a Technology Due Diligence and selected 10 x GE Jenbacher 24 cylinder engines with a generation capacity of 40MW. ADC developed the project, at risk, over a period of …
Development of Power Alt Facility | Middelburg, Mpumalanga
Development on the Power Alt facility; Middelburg, South Africa, started in 2007, where ADC was able to reach financial close on this 10MW facility within 3 weeks of partnering with an interested lender/investor. Construction commenced in 2008 and ADC Projects was appointed as the Owner’s Project Manager. The project was successfully completed, on time and within budget, 11 months from …
Ghana 360MW Natural Gas Scoping Study, PIM and preliminary Design
ADC Projects was contracted to assist in a High Level Scoping Study to determine the requirements for a Thermal Power Facility project in Ghana to progress into the feasibility phase. The Project Developer identified a potential project site near the town of Daboase for the 400MW power facility and staff village to be constructed. Combined Cycle Gas Turbine technology, with …